Car Point Sales, Rochdale
Client: JLE Corporates Ltd
Description: A collapsed stone river wall at Sudden Brook led to this commercial plot becoming an unusable and unsafe site. DTM Groundworks Ltd were employed to first of all remove the remnants of the 100-plus year old original wall and make the site safe. A cofferdam was then created to form a dry work area to enable a new concrete foundation to be installed below the water level. DTM Groundworks Ltd then constructed a new interlocking concrete block retaining wall. The difference in levels between the river and site meant this new retaining wall had to be 5.5m high. The installation of a Tensar geogrid tied the new concrete ‘Lego’ block style wall into the 6F2 stone backfill material. A new powder coated 868 mesh fence was installed to the top of the new river wall on completion. This represented a challenging project carried out in a live river. The site was up and running within a matter of weeks. Photos can be seen to the right.
Market Street, Manchester
Client: B&E Boys Ltd
Description: Installation of a lift pit in the basement of the former HMV store on Market Street, Manchester. No access for mechanical plant along with the city centre location led to a logistically challenging project but successful project.
Euro Retail Park, Ipswich
Client: Weiser Construction Ltd
Description: Foundations and external works to new Costa Coffee within existing retail park development.
Retail Park, North Quay, Lowestoft
Client: Weiser Construction Ltd
Description: Reinforced concrete ground beams and stantion bases at an extension to an existing retail unit.
Lidl Supermarket, Bury
Client: Castlehouse Construction Ltd
Description: New build supermarket on the site of a former gas works. DTM Groundworks have completed site preparation and enabling works. Further works include new foul and surface water drainage system, service installations and hard landscaping.
Lidl Supermarket, Accrington
Client: Castlehouse Construction Ltd
Description: Demolition of existing supermarket and complete re-build. Our works consisted of new foul and surface water drainage system, electrical service installation and comprehensive hard landscaping works including kerbs, trief containment kerbs, edgings, brushed concrete slabs, bollards, cycle stands and trolley bays.
Hydro Electricity Project, J2 Business Park, Bury
Client: B&E Boys Ltd
Description: New hydro electric plant on the River Roche. Please see our dedicated Hydro Power page for more information.
Council Depot, Davyfield, Blackburn
Client: Globe Management Services Ltd
Description: DTM Groundworks Ltd undertook all bulk earthworks, groundworks and landscaping associated with the construction of this new motor vehicle service station with two storey office space and associated vehicle parking.
Lidl Supermarket, Sowerby Bridge
Client: Castlehouse Construction Ltd
Description: Extensive refurbishment comprising of in-situ concrete ground beams, reinforced concrete floor slab, new foul and surface water drainage system, new electrical service installation and comprehensive hard landscaping works including kerbs, trief containment kerbs, edgings, precast concrete flags, block paving, brushed concrete slabs, bollards, lamp post protection hoops, cycle stands and trolley bays.
Blackburn Bus Depot, Blackburn
Client: Transdev Lancashire United
Description: Various works carried out including new external reinforced concrete slabs, new staff car park with channel drainage, reclaimed tarmacadam surfacing, new perimeter fencing and used railway sleepers to segregate fire escape routes.
Housing Development and Snooker Club, Menston, Leeds
Client: Castlehouse Construction Ltd
Description: New snooker club including adopted foul and surface water drainage, adopted highway works, foundations and floor slabs including a first floor suspended slab.
Halfords, Rochdale
Client: B&E Boys Ltd
Description: New service facility and car parking on a compact town centre site. The works include remedial works to the site comprising on the excavation and disposal of existing cellars and temporary sheet piling works.
Fit Out, Caton Road, Lancaster
Client: Globe Management Services Ltd
Description: New car park and road infrastructure works. Includes kerbing, block paving, precast concrete flagging and landscaping.
Dreams, Croft Retail Park, Bromborough
Client: B&K Building Services
Description: This project was undertaken within a busy retail environment and involved major drainage diversion works prior to commencement of the foundations. New service yards, car parking spaces, block paving and street furniture (including bike stands, bollards and trolley bays) will also be undertaken.
Car Wash, Rawtenstall
Client: B&E Boys Ltd
Description: This project involved the installation of underground services for the water, power, CCTV and lighting systems along with the drainage system complete with oil bypass separator. Kerbing, concrete hardstandings and fencing works complete the project.
Cheetham Hill Shopping Centre, Manchester
Client: Thistle Construction Ltd
Description: Large-scale town centre re-development comprising of foundations, floor slabs, services installations and extensive drainage works which include several underground storage chambers. The majority of the work is in ground already occupied by numerous existing service installations.